SPMG — Auburn Property Management

Lead Paint and Older Auburn Homes: Disclosure, Repairs and California's Lead Hazard Rules

Learn Facts checked November 9, 2026

Reviewed by Mark Shvaya, Designated Broker, CA DRE #02243502, on November 9, 2026

Short answer

If your Auburn rental was built before 1978, federal law requires a lead disclosure before the tenant signs: the EPA pamphlet, anything you know about lead paint or hazards, any reports you have, and a signed warning statement you keep for 3 years. Testing is not required. Paid work that disturbs paint must follow EPA's lead-safe renovation rule, and California treats deteriorated lead paint above set levels as a housing code violation.

Why 1978 is the year that matters

EPA notes that the federal government banned the sale of lead-based paint for home use in 1978. Federal rules call housing built before that year "target housing," and most of the lead duties below apply only to it. The building's construction date, not the date of its last paint job, decides whether a home counts.

That line runs straight through Auburn. Census estimates for 2020 to 2024 put the city's median year built at 1978, which means a large share of local homes were built before the cutoff, from pre-1940 cottages to 1970s ranch houses. If you are not sure when your house was built, check your purchase documents or county property records before you list it.

What the disclosure rule asks of a landlord

The federal rule (40 CFR 745, subpart F, with a parallel HUD rule in 24 CFR 35) sets out steps that must be completed before the tenant is obligated under the lease:

  • Give the EPA pamphlet "Protect Your Family From Lead in Your Home" or an approved equivalent.
  • Disclose any lead-based paint or lead hazards you know about, with what you know about their location and condition.
  • Provide any records or reports you have about lead in the home, including common areas.
  • Include the federal Lead Warning Statement in the lease or an attachment, with your disclosure, a list of the records provided, the tenant's acknowledgment and signatures with dates. EPA publishes a sample lessor form.
  • If an agent such as a property manager is involved, add the agent's statement and signature.
  • Keep the signed copy for at least 3 years from the start of the lease.

Timing, electronic forms and exemptions

If an applicant has already made an offer to rent before you disclose, you must complete the disclosure before accepting and give the applicant a chance to review it and change the offer. EPA allows electronic disclosure, but only with the renter's consent and a clear statement of the right to paper copies.

The rule does not apply to homes built in 1978 or later, to leases of 100 days or less that cannot be renewed or extended, to homes a certified inspector has found free of lead-based paint, or to renewals where everything was already disclosed and nothing new has come to light. Studios and other zero-bedroom units and housing for older adults or people with disabilities are exempt too, unless a child under 6 lives there or is expected to. When in doubt, giving the disclosure costs little, so many managers simply use it for every pre-1978 lease.

How the lead rules apply to common Auburn rental situations
Your situationWhat usually appliesWhere to read it
House built before 1978, standard leaseFull disclosure: pamphlet, known hazards, reports, signed warning statement40 CFR 745.107 and 745.113
House built in 1978 or laterFederal disclosure rule does not apply40 CFR 745.103
Studio with no child under 6Exempt from the disclosure rule40 CFR 745.103
Lease of 100 days or less with no renewalExempt from the disclosure rule40 CFR 745.101
Renewing a tenant who already got the disclosureExempt if nothing new has been learned40 CFR 745.101
Planning paid work that disturbs paintEPA certified firm unless it fits the minor repair limits40 CFR 745, subpart E
Peeling or chipping paint foundPossible state lead hazard; repair with lead-safe methodsHealth and Safety Code 17920.10

The manager's duty and the cost of skipping it

Under 40 CFR 745.115, an agent who leases target housing for an owner, which includes a property manager, must tell the owner about these duties and make sure they are carried out. An agent who did that is not liable for lead information the owner knew but never shared.

The stakes are real. A person who knowingly violates the rule can be liable to the tenant for three times the damages, along with court costs and attorney fees, and can face federal civil penalties. The pamphlet and form take minutes; skipping them is the expensive choice.

In practice, a careful manager keeps a lead file for each pre-1978 home: the signed disclosure for every lease, copies of any reports, and the pamphlet version given. SPMG's services page lists lease agreements and the related paperwork as part of full-service management. The other items to finish before a tenant signs are on our rent-ready checklist.

Repairs, repainting and the lead-safe renovation rule

A second federal rule covers work, not paperwork. Under EPA's Renovation, Repair and Painting (RRP) rule, anyone paid to disturb painted surfaces in target housing must work for an EPA certified firm, with the job directed by a certified renovator. EPA says the rule also applies to owners doing this work in a home they rent out. California does not run its own RRP program, so EPA administers it here.

Small jobs are exempt as minor repair if they disturb 6 square feet or less of paint per room inside, or 20 square feet or less outside, and avoid banned methods. Window replacement and demolition of painted surfaces never count as minor. Before work starts, the firm must give the owner and an adult occupant the "Renovate Right" pamphlet, no more than 60 days ahead. Open-flame burning of paint is banned, and power sanding is allowed only with a shroud and HEPA vacuum. For how this affects upgrade choices, see our must-fix versus optional upgrade guide, and for vetting whoever does the work, see our guide to your own contractor versus the manager's vendors.

California's own lead hazard rules

State law adds a habitability layer. Health and Safety Code 17920.10 treats a building as violating the State Housing Law where it has lead hazards: deteriorated lead-based paint, lead-contaminated dust or soil, or lead paint disturbed without containment, at or above the levels set in state regulations. Civil Code 1941.1 then counts such a unit as untenantable. The California Department of Public Health (CDPH) notes that local enforcement agencies may order lead hazards abated.

CDPH also certifies lead professionals. Anyone paid to do lead inspections or risk assessments in residential buildings must be a CDPH-certified Inspector/Assessor, and permanent lead abatement work calls for certified supervisors and workers. So peeling paint on a pre-1978 rental is a repair to plan, not a cosmetic note. The site's post on preparing a property for rent covers the wider pre-move-in walk-through.

Common questions

Do I have to test my Auburn rental for lead paint?

No. EPA states that landlords and property managers are not required by the disclosure rule to have a paint inspection done. A tenant may ask for one before signing. If you choose to test, use a certified professional; in California, paid lead inspections must be done by a CDPH-certified Inspector/Assessor, and you must share any report with future tenants.

What if I do not know whether my house has lead paint?

You can still comply. The lessor disclosure form lets you state that you have no knowledge of lead-based paint or hazards and no reports. You must still give the EPA pamphlet, include the warning statement and collect signatures before the tenant is bound. If you later learn something new, disclose it at the next lease or renewal.

Does the lead disclosure apply to a month-to-month rental?

Usually, yes. The short-term exemption covers only leases of 100 days or less where no renewal or extension can occur. A month-to-month agreement keeps renewing, so it does not fit that exemption. The other exemptions, such as homes built in 1978 or later or certified lead-free homes, still apply as written.

How long do I keep the signed lead disclosure?

Keep the completed form, or the lease containing it, for at least 3 years from the start of the lease. Your agent, such as a property manager, has the same duty. Many owners keep it for as long as they own the home, because a later tenant, buyer or inspector may ask about earlier disclosures.

Recent changes

Sources

  1. 40 CFR Part 745, Subpart F, Lead disclosure on sale or lease (eCFR)
  2. EPA: Real Estate Disclosures about Potential Lead Hazards
  3. 40 CFR Part 745, Subpart E, Residential Property Renovation (eCFR)
  4. EPA: Lead Renovation, Repair and Painting Program
  5. Health and Safety Code 17920.10, Lead hazards (California Legislative Information)
  6. CDPH: Is lead certification required for the work I do?
  7. CDPH: Lead-related laws and regulations
  8. U.S. Census Bureau, ACS 2020 to 2024 Table B25035, Median Year Structure Built, Auburn city

Facts checked November 9, 2026 against the sources above. Reviewed by Mark Shvaya, Designated Broker, CA DRE #02243502. This guide is general information about California rules, not legal or tax advice for your situation.

Keep reading

All owner guides

No obligation · Free consultation

Schedule a FREE Discovery Call

Getting started with SPMG is easy — you can sign up in minutes. Let’s protect your investment and take the stress out of owning rental property.

Call